DJALAL, M. R.; YUNUS, M.; IMRAN, A.; SETIADI, H. Capacitive Energy Storage (CES) Optimization For Load Frequency Control in Micro Hydro Power Plant Using Imperialist Competitive Algorithm (ICA). EMITTER International Journal of Engineering Technology, v. 5, n. 2, p. 279-297, 13 Jan. 2018.