(1)
Djalal, M. R.; Yunus, M.; Imran, A.; Setiadi, H. Capacitive Energy Storage (CES) Optimization For Load Frequency Control in Micro Hydro Power Plant Using Imperialist Competitive Algorithm (ICA). EMITTER Int’l J. of Engin. Technol. 2018, 5, 279-297.