[1]
Djalal, M.R., Yunus, M., Imran, A. and Setiadi, H. 2018. Capacitive Energy Storage (CES) Optimization For Load Frequency Control in Micro Hydro Power Plant Using Imperialist Competitive Algorithm (ICA). EMITTER International Journal of Engineering Technology. 5, 2 (Jan. 2018), 279-297. DOI:https://doi.org/10.24003/emitter.v5i2.195.